Construction Time-Lapse and Deconstruction Prompt Comparison (Seedance 2.0 vs. Grok)

The user compares the performance of Grok and Seedance 2.0 for generating a time-lapse video of a building's construction/deconstruction. The tweet contains two highly detailed prompts: one for construction (used for Seedance 2.0) and one for deconstruction (used for Grok). Only the construction prompt is extracted as it was successfully used with Seedance 2.0, demonstrating a clear video generation instruction.

提示词

7,112 字符打开 Astorie 创作台 ↗
Fixed-position wide-angle time-lapse photography, fully documenting the entire process of a building from empty foundation to completion. The camera remains fixed, only using time compression (10-30x fast-forward) to present the construction rhythm, showing natural light cycling through the scene (morning → noon → dusk → night). Phase 0: Empty Starting Point - The flat, empty raw site with survey stakes and layout lines visible. Construction equipment has not yet arrived. The background environment (mountain/sea/city skyline) is clearly visible as the only stable, unchanging element throughout the entire piece. Static frame lasts 3 seconds. Phase 1: Site Preparation and Foundation Work - Excavators and bulldozers quickly arrive, safety fences erected, safety signs in place. Excavators dig foundation trenches, soil loaded onto transport vehicles and moved to one side of the site. Reinforcement mesh quickly laid in the foundation pit, concrete mixer trucks enter, pour, and level. Foundation outline gradually becomes clear in the frame. Phase 2: Main Structure Growth - Scaffolding rapidly rises from the ground like a skeleton growing. Concrete columns and floors are poured layer by layer, each completed level visibly raising the entire building—presenting a stepped rising rhythm (not continuous flying up). Cranes continuously rotate, precisely lifting reinforcement, formwork, and concrete components to working levels. Material stacking areas remain visible beside the building, material piles grow and shrink with work progress. Phase 3: Envelope and Exterior Wall Closure - After floor structure completion, exterior wall materials begin installation: Brick structure: workers lay bricks layer by layer, walls rise quickly Glass curtain wall: crane lifts whole glass units, workers position and fix them Wooden exterior: workers assemble piece by piece, wooden boards cover in sequence Stone facade: pre-cut stone panels lifted, adhered, pressed tight Building transitions from transparent skeleton to being "filled" with exterior walls, outline becoming increasingly clear. Phase 4: Roof Completion - Roof structure completed with worker coordination: waterproof layer laid, insulation layer covered, surface materials placed piece by piece (tiles/metal roofing/flat roof paving). Roof closure marks completion of main building form, overall outline presented for the first time. Phase 5: Doors, Windows and MEP Installation - Door and window frames precisely installed in openings, glass slowly positioned by workers with lifting equipment. Simultaneously, conduits, water pipes, air ducts quickly thread through inside and outside walls, like blood vessels extending through the building interior. Electrical equipment, plumbing fixtures progressively arrive and install, interior space rapidly transforming from empty shell to functional body. Phase 6: Interior Finishing and Exterior Completion - Interior floor铺设, wall coatings, ceilings progressively completed, each space transitioning from rough to finished state. Exterior simultaneously advances: facade finishing, exterior wall paint rolling or cladding attachment, window sill coping, building surface texture gradually becoming refined. Phase 7: Landscape and Site Completion - Safety fences removed, construction equipment departs in sequence. Landscaping construction vehicles arrive: topsoil spreading, trees lifted by crane into planting holes, shrubs quickly covering ground, turf laid in sections. Hard paving (stone/wood/concrete) completed piece by piece. Lights, signs, facilities installed in sequence. Phase 8: Completed State - Last construction vehicle departs, site restored to cleanliness. Building stands complete: facade pristine, landscape lush with greenery, lights illuminated. Static frame lasts 5 seconds. Background environment (mountain/sea/skyline) remains that same initial area, never changed. Frame frozen—from empty land to building, witnessing the birth of a house. Technical Parameters: Camera: Fixed wide-angle, composition covering building main body + surrounding material staging area + vehicle access channels Style: Construction documentary, 4K ultra-clear, industrial texture tones → completion warm tones Time compression: 10-30x, maintaining mechanical action readability Audio: Construction sounds (mechanical rumbling, steel collision) fast-forward processed → transitioning to ethereal music at completion No watermark, no subtitles, no text overlay

Precision Dismantling: [Reference Image Building Name] Organized Deconstruction Time-lapse, Type: Building Precision Dismantling Time-lapse / Fixed-position Reverse Record, Duration: High-speed Reverse Evolution Sequence (Complete Ordered Dismantling Cycle), Core Principle: Prohibit magical transitions; use fast-forward to display real processes of mechanical and人工 ordered dismantling, material stacking, transfer and cleanup. Absolutely prohibit uncontrollable shots like collapse, explosion, sudden disappearance. All dismantling must be controlled, step-by-step, ordered engineering operations. Demolition Methodology: Industrial-grade precision dismantling: human + mechanical cooperation → piece-by-piece disassembly → classified stacking → systematic transfer → site clearing. Reference Image Analysis: Instruction: Deeply analyze user-provided [reference image], silently record all building key details as 100% precise starting point for dismantling origin. Analysis Checklist: [Building style type (modern/traditional/mixed/tropical/industrial etc.), Building floors and overall scale (single-story/multi-story/villa/mansion), Main structural form (wood/concrete/steel/masonry), Exterior facade materials (wood/stone/glass/concrete/metal/coating), Dismantlable component checklist (roof/doors-windows/exterior wall panels/floors/columns-beams etc.), Material estimation (how many cubic meters of wood/steel/concrete blocks need stacking), Dismantling difficulty assessment (which parts need cranes vs manual dismantling)]. Initial State Lock: Phase 0 must 100% restore reference image completed state as starting point for ordered dismantling. Narrative Timeline: [Phase 0: Completed State (Pre-dismantling Preparation), Phase 1: Dismantling Preparation and Landscape Removal, Phase 2: Interior Items Dismantling and Transfer, Phase 3: First Batch Material Transfer (Partially Clearing Staging Area), Phase 4: Doors, Windows and Special Component Removal, Phase 5: Exterior Wall Material Removal, Phase 6: Second Batch Material Large-scale Transfer, Phase 7: Main Structure Dismantling (Ordered Disassembly Top-to-Bottom), Phase 8: Foundation Removal and Material Clearance] - Each phase contains detailed visual descriptions, motion style, key action, material flow, and importance/emphasis notes. The prompt details the entire process from initial complete building state through systematic deconstruction, material sorting, removal, and final site clearance, with emphasis on controlled demolition methods avoiding magical transitions or collapse scenarios. Note: This prompt appears truncated in the original source.
来自原帖查看来源 ↗

更多灵感

Melancholic Beauty Film with Sheet Music

Melancholic Beauty Film with Sheet Music

AriaSeedance 2.0
Create an exactly 15-second, 16:9 Full HD (1920×1080), 24 FPS photorealistic cinematic beauty film using the uploaded reference image and character sheet. Preserve the character’s exact identity, facial features, hairstyle, hair color, outfit, body proportions, environment, and original visual aesthetic.

Begin with a high-angle shot of the character lying diagonally on the floor among scattered sheet music, gazing blankly at the notes. Slowly glide the camera toward her face as a loose page drifts across the lens, creating a paper-wipe transition. Cut to an extreme close-up of her eyes, eyelashes, and natural skin texture, with one subtle blink, a distant gaze, and a slow macro push-in. Match-cut from the reflection in her eye to a sheer curtain gently billowing in cool daylight, with subtle movement in nearby music sheets and loose hair strands.

Transition through the moving curtain into a low-angle, floor-level tracking shot, moving from her hand holding sheet music along her resting forearm toward her face. She must remain completely flat on the floor, with her cheek resting on her forearm and that arm lying directly on the floor. Her free hand loosely holds a sheet of music near her face. Only her eyes shift toward the camera; her head, shoulders, and upper body remain resting on the floor. Maintain her melancholic, distant expression.

For the final four seconds, reveal a wider cinematic composition of the character, scattered sheet music, softly moving curtain, and existing environmental elements. Slowly pull back while drifting sideways, allowing a few pages to move naturally in the breeze. Hold the final beauty frame briefly and fade smoothly to black at exactly 15 seconds.

Use elegant editorial cinematography, soft diffused lighting, natural skin texture, delicate facial highlights, expressive eyes, shallow depth of field, subtle film grain, muted pastel tones, refined cinematic color grading, and graceful camera movement. Preserve the reference image’s original lighting and color palette, including warm amber highlights and cool blue daylight if present. Create five distinct shots with intentional paper-wipe, eye-reflection, curtain-wipe, and gaze-match-cut transitions. Keep character animation minimal and environmental motion realistic.

Negative prompt: Identity drift, altered face, hairstyle, hair color, outfit, or environment; extra characters; smiling; exaggerated expressions; raised head; lifted shoulders; elbow-supported pose; elevated upper body; sitting; unnatural neck angles; deformed hands; extra fingers; unnatural paper grip; floating pages; chaotic wind; excessive hair movement; unrealistic physics; jitter; flicker; shaky camera; random zooms; abrupt transitions; harsh lighting; plastic skin; excessive retouching; cartoon; anime; vertical framing; text; logos; watermarks; low resolut
使用此提示词 ↗
IGNITE Energy Drink Commercial Script
Adidas Football Boot Assembly Timelapse
Keys Floor Renovation Time-lapse

Keys Floor Renovation Time-lapse

Linh AiSeedance 2.0
Vertical 9:16 hyper-realistic transformation video, documentary style, static wide-angle camera from the corner of an empty white room with one bright window and a bare concrete floor.

Shot 1 (0–4s): A bearded man in blue denim overalls and a black long-sleeve shirt rakes a huge cone-shaped pile of thousands of antique brass and iron keys with a black leaf rake, methodically spreading the keys evenly until the entire floor is covered in a dense carpet of old keys.

Shot 2 (4–8s): A woman with long brown hair in red overalls and black gloves pours thick glossy white self-leveling epoxy resin from a large white plastic bucket; the milky liquid flows outward in smooth waves, swallowing the keys and covering the whole floor with a mirror-smooth white surface, a few key silhouettes poking through.

Shot 3 (8–17s): A worker in a yellow high-visibility vest, black cap and grey work pants pushes a red-and-white ride-on floor grinder with a black vacuum hose, polishing the hardened epoxy in smooth passes; golden key shapes emerge embedded in the glossy floor like terrazzo, reflections of the window and the worker visible on the mirror-like surface.

Shot 4 (17–23s): Two workers in black polo shirts and black caps assemble a dark walnut bed frame in the center of the room, place a white mattress, smooth out white bedding and pillows, then wooden nightstands with white ceramic lamps appear on both sides; the finished bed with beige accent pillows stands on the polished floor full of golden keys as the workers walk out of frame.

Bright natural daylight, soft shadows, satisfying ASMR renovation timelapse mood, photorealistic textures, smooth motion, no text, no watermark.
使用此提示词 ↗
Cucumber Floor Renovation Time-lapse

寻找下一个方向

ASTORIE CANVAS

让灵感,继续生长。

在同一个创作空间,连接提示词、参考素材和生成结果。

打开创作画布 ↗